To arrange a consultation call us at 1-888-293-8938 or Email
We are seeing more locations where decks need to be placed on floating footings. This site in Guelph has such rocky soil that they scraped out 9' deep trenches, built the homes then backfilled the rocky soil. This means that any traditional 4' deck footings will settle and heave. We had to devise our own method to combat this tendency.
This handsome looking deck with pergola was also roughed in for a hot tub. (framed for and concrete slab in place).
Wrap around steps help blend the deck with the future patio.